Roll Bar & Subframes
Up Next

100_2189.JPG
I am learning to weld as I go
hopefully I have the roll bar
 positioned correctly ;)
100_2190.JPG
I actually had some pretty good welds
 on the roll bar, and others need a
 bit of grinding and touch up
100_2191.JPG
It is starting to resemble a chassis
 that is ready to put together,
 finally. I think in a week or so 
I will be ready to start assembling the suspension
100_2192.JPG
The passenger side bump stop is trimmed
 for wider tires, after which I capped
 the open end with a new piece of metal
100_2193.JPG
The drivers side was tougher, and I still have a little rust prep to do on the seam!
100_2194.JPG
The subframe connectors are getting welded into place
100_2195.JPG
A good number of hours were used in cutting the rear leaf springs loose, prior to welding the subframe connectors on.
 
 

[ Roll Bar & Subframes ] Rear axle ] Roller Spring Perches ] FR 500 Wheels and 315 35 17 Tires ] FR 500 Wheels mounted with 315 35 17 Tires ] Hydraulic Clutch Master Cylinder ] Installing The Mustang Stainless Magnaflow Exhaust Kit ] TKO 5 Speed goes into the 'Stang ] Big Disk Brake Kit for the Rear Axle ] Bilstein Shocks and Electric Exhaust Cutouts ] Shelby Big Front Disc Brake Install ] Specialized Bumpsteer Kit and Wheel Alignment ]